No. of Questions | Mark Of Each Question | Duration | Min Passing Percentage |
50 | 1 | 120 min | 40% |
0 of 50 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 50 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
6-3-5 stands for
A common measure of variation is?
A green belt is going to monitor the number of defectives on different sized samples. Which of the following control charts would be most appropriate ?
A process has a mean of 10 and a standard Deviation of 2. What is the tolerance of the process that exhibits the limit of normal variation with 99% confidence?
A process is in-control and stable. Describe the type of variation that exists in the proccess
______is/are the deliverable/s of Control Phase
An attribute chart can be represtated by all of the following EXCEPT
Arrange the Six Sigma Process Improvement approach in the correct order: 1) Measure, 2) Define, 3) Control, 4) Improve, 5) Analyze
Benchmarking is concerned with finding and comparing organization processes to ?
Cause and Effect Diagrams are also known as?
CTQ stands for ?
Determine the Mode for the following data set: 2 3 2 1 0 0 4 6 2 1 3 4 4 4 ?
DMAIC methodology is used to
Who trains and coaches black belts, green belts and leaders
Fool proofing (Japanese) ?
If severity =5, Occurrence = 4, Detectability = 2, what is RPN
In a control chart, control limits are ?
In a Pareto Chart, the cumulative frequency percentage line is ?
In Japanese,Non Value Added activity in a process is called as
In order for a problem to be solved correctly, which of the following must occur first?
In Y=f(x), X represents the _____ of the process and Y the _____ of the process?
Indicate which are the examples of the variable data: 1) Length, 2) Weight, 3) Decision on the coin toss, 4) Dollars, 5) Days
MINITAB is a .
What does “E” stands for in ESCAP technique
MSA stands for ?
One characteristic of attributes data is that it is always?
People who are directly affected by the project?
Poka Yoke was developed by
RPN in FMEA stands for ?
Select the correct Mean, Median, Mode for the following sample: 4,5,6,1,1,2,5,7,5
Sigma “s” represents…
SIPOC is also known as
SPC stands for ?
The 6 M of Cause and Effect Diagrams include all of the following except ?
The average time spent waiting in queue for a bank teller is 8 minutes. The standard deviation is 30 seconds. What is the tolerance of the process that exhibits the limits of normal variation?
The central tendency of data set can be represented as ?
The concept of discovering what is the best performance being achieved, whether in your company, by a competitor, or by an entirely different industry is called as ?
The expression “Y=f(x)” is best described by…
The first step in getting started with process improvement is to?
The first step to construct a Cause and Effect Diagram is?
The goal statement in a project charter should be
The median for the following numbers (6, 3, 2, 5, 1, 8,7) is ?
The method that attempts to reduce the overall risk on a system is called ?
The number one rule of brainstorming that is most frequently violated is ?
The Pareto Principle suggests that importance should be placed on?
The person who apply breakthrough strategy to specific projects, lead and direct teams to execute projects are called?
The primary factor in the successful implementation of six sigma is to have ?
The primary objective of brainstorming is to
The prime use of a control chart is to ?
The problems that can be solved easily and quickly are known in the six sigma hierarchy as